New Liner needed for HOVMSD

We flush the toilet and take for granted that our waste is carried away and treated as needed. That job is carried out by the Heart of the Valley Metropolitan Sewerage District (HOVMSD), which is now preparing to embark on a major interceptor rehabilitation project. Due to surface corrosion in the main Interceptor that carries the waste to the treatment plant, a liner needs to be installed. Look for updates here as planning continues for the work to take place in 2023 and 2024.

For more information, visit https://hvmsd.org/interceptor-rehabilitation-project/.